1.
Wan Aris WMS, Abdul Rahim N, M. Mansor M, Abdul Rahman NS. Operational Cost Models for an Earth Station System Using 2-Parallel and 4-Parallel Configurations. IIUMEJ [Internet]. 2024 Jul. 14 [cited 2024 Jul. 16];25(2):232-45. Available from: https://journals.iium.edu.my/ejournal/index.php/iiumej/article/view/3063