[1]
Susanti, B. et al. 2019. LIFE CYCLE COST ANALYSIS OF A PBC PILOT PROJECT FOR ROAD IN INDONESIA. IIUM Engineering Journal. 20, 2 (Dec. 2019), 57–69. DOI:https://doi.org/10.31436/iiumej.v20i2.1075.