[1]
Wan Aris, W.M.S. et al. 2024. Operational Cost Models for an Earth Station System Using 2-Parallel and 4-Parallel Configurations. IIUM Engineering Journal. 25, 2 (Jul. 2024), 232–245. DOI:https://doi.org/10.31436/iiumej.v25i2.3063.